Sloterweg 22 offers three- and four-room apartments, ranging from 80 to 138 m². Heyligers Architects handled the interiors. Tall windows bring in abundant daylight and, together with the generous outdoor spaces, create an open feel. Each home has a spacious bathroom, separate toilet and large eat-in kitchen. The entrance and communal areas get an elegant finish, making the apartment complex feel like home from day one.
The basement will contain storage units and ample parking for residents. Additional parking is available outside the building. The result: a pleasant living environment where comfort and greenery go hand in hand.
The facade makes all the difference. The base features anthracite slate, while the floors above are clad in pine wood. The balconies are concrete, framed by black aluminum windows. Glass balustrades with steel railings provide transparency. Horizontal gray bands, half a meter wide, emphasize the different floor levels. The combination of light-dark and rough-smooth gives the building a contemporary look. A striking addition to the neighborhood.
Badhoevedorp combines village calm with city convenience. The shopping center is a five-minute walk and offers all daily essentials. In the area, you’ll find plenty of sports clubs and restaurants. Amsterdam and Haarlem are nearby, as are the Johan Cruijff ArenA and Ziggo Dome. The Amsterdamse Bos and Nieuwe Meer offer green escapes.
The A4, A10 and A9 quickly connect you to Amsterdam or Haarlem. Schiphol is right around the corner. The village has excellent public transport, and surrounding areas are easily accessible by bike.
The Lenny is future-proof. The building will have solar panels, and all apartments are gas-free. Upon completion, the homes will meet energy label A standards. The parking area will include EV charging stations for residents. Sustainability isn't an extra – it’s built in. A new chapter for a 1940s building.
The environmental permit application is being processed. Demolition work down to the concrete frame is complete. Construction is scheduled to begin once the permit is granted, likely in the third quarter of 2026.
Architect: Piet Onderwater & Partners
Interior architect: Heyligers Architects
Installation consultant: Hiensch Engineering
Building physics and fire safety: Peutz
Structural engineer: Van Rossum Raadgevende Ingenieurs